Annual Operating Program
In compliance with the provisions of Article 17, Section III of the Planning Law, as well as the eleventh condition of the concession title, the Annual Operating Program 2025 (POA) of the Administration of the National Port System Ensenada, S.A. de C.V. is presented, which regulates the actions to be carried out by the entity. The POA groups the different areas of responsibility of the entity, which with this document, will have the bases that will guide the actions to be executed in 2025.
Download Annual Operating Program